VALICALC · ENGINEERING WORKFLOW
Heating load to heat-pump capacity check
Build an envelope and outdoor-air heat-loss estimate, compare a heat-pump capacity basis, then separate peak kW from annual kWh and running cost.
Start this workflowWhat do I need to know first?
- Indoor/outdoor design temperatures and conditioned volume
- Net areas and whole-assembly U/R values, plus outdoor-air ACH
- Equipment capacity at the relevant conditions; annual useful heat and seasonal COP for cost
Goal and model boundaries
Keep assembly insulation, peak heat loss, equipment capacity and annual energy assumptions consistent.
- The heat-loss calculation is a steady model, not a complete professional building-load design.
- A rated heat-pump capacity must be checked at the design outdoor temperature, including defrost/backup behavior.
CALCULATE → SELECT → VERIFY → CONTINUE
Carry the selected component into the next check
Open the calculator, calculate the requirement, choose a known component family and verify the actual selected size. Review the changed result before continuing; a theoretical target and a catalog component can give different downstream results.
Selections stay in the current calculator session. Inputs and product choices are not transferred silently between tools or stored in My Tool Case.
Check the insulation basis
Identify whether a value describes material or a whole assembly.
U = 1/R only for the same complete layer/film basis.
- Expected output
- A documented assembly heat-transfer assumption.
- Next step
- Enter net surface areas and assembly U/R values in Heat Loss.
Estimate design heat loss
Separate exterior surfaces and enter design temperatures and effective outdoor-air ACH.
Transmission is ΣUAΔT; outdoor-air loss adds ρcpV × ACH/3600 × ΔT.
- Expected output
- Peak transmission, air loss and combined heating-load estimate.
- Next step
- Carry the known load into the equipment capacity comparison.
Compare capacity and operating cost
Use known-load mode, then a separate annual heat/seasonal-COP cost scenario.
Capacity comparison uses a stated load; annual electricity = useful heat/COP plus auxiliaries.
- Expected output
- A capacity basis and an independent annual energy/cost estimate.
- Next step
- Verify manufacturer cold-weather curves and get a project-specific load/design check.
Units and context
- Whole-assembly R differs from an insulation material-only R.
- Peak kW cannot be copied into annual kWh without an explicit time/load model.
Common mistakes to avoid
- Counting windows both as wall area and separate glazing
- Using a warm-weather rating for cold-weather heating capacity
- Confusing COP/EER with a seasonal performance guarantee