Step 1
Resolve electrical load
Solve real power, voltage or current with phase and power factor.
Open Electrical PowerCalculator cluster
Connect real electrical power, motor demand, cable resistance, voltage drop and reactive compensation with battery runtime and operating energy cost.
7 calculators in this cluster
Compare voltage-drop criteria for copper and aluminum conductors.
These planning estimates do not select protective devices or certify installations.
Step 1
Solve real power, voltage or current with phase and power factor.
Open Electrical PowerStep 2
Keep shaft output and electrical input separate using efficiency.
Open Motor CurrentStep 3
Compare voltage drop, minimum conductor area and maximum length.
Open Voltage DropStep 4
Compare load hours, duty cycle, battery runtime and cost.
Open Electrical Energy CostChoose the variable you know and the quantity you need to solve. Each tool shows its formula, default worked example, and nearby calculations.
Estimate DC or AC resistive voltage drop, minimum conductor size or maximum cable length with copper/aluminum, AWG/mm² and conductor temperature.
Solve electrical input power, current or supply voltage for DC and balanced AC loads. SI/US units, clear methods and related references.
Estimate motor running current from shaft output, efficiency and power factor. SI/US units, clear methods and related references.
Estimate reactive compensation and compare current before and after correction. SI/US units, clear methods and related references.
Calculate temperature-adjusted conductor resistance or solve metal area and length. SI/US units, clear methods and related references.
Estimate battery runtime or required amp-hour capacity for a constant load. SI/US units, clear methods and related references.
Build a multi-load energy and cost estimate with quantity, hours and duty cycle. SI/US units, clear methods and related references.
Turn shaft power, voltage, efficiency and power factor into a running-current estimate, then check cable voltage drop and conductor geometry.
Plan the job →ENGINEERING WORKFLOW · 3 STEPSChoose a conductor area or maximum one-way cable length for a DC circuit using an explicit voltage-drop budget and wire geometry lookup.
Plan the job →ENGINEERING WORKFLOW · 3 STEPSSeparate shaft output, real input power, apparent power and running current for a balanced three-phase motor; carry a checked current into a cable calculation.
Plan the job →Carry shared inputs through an integrated preliminary check.